Projects completed or under way in 2019 include:
- Design build of 2,000,000 square feet (186,000 m2) of Reinforced Earth® walls; 15,000 linear feet (4.6 km) of coping and 120,000 linear feet (36.6 km) of half-connector barriers for the Transform 66 Outside the Beltway project, in Virigina, USA;
- Design and supply of 31,000 m² of TerraTilt® and TerraPlus® facings as part of the NorthLink West Australia road project;
- 8,570 m2 of a GeoStrap® and GeoMega® system for the Mae Khem Interchange in Thailand;
- -310 m of TechSpan® culverts for the Toluca-Naucalpan highway in Mexico;
- 3,835 m2 of TerraPlus® system for the Spence Growth Operation Project at the BHP Billiton – Spence Copper Mine in Chile