{"id":11477,"date":"2024-09-23T11:31:08","date_gmt":"2024-09-23T11:31:08","guid":{"rendered":"https:\/\/dev.terre-armee.com\/indonesia\/?post_type=avada_portfolio&p=11477"},"modified":"2024-10-10T07:54:43","modified_gmt":"2024-10-10T07:54:43","slug":"lumut-balai-unit-2-geothermal-plant","status":"publish","type":"avada_portfolio","link":"https:\/\/dev.terre-armee.com\/indonesia\/reinforced-earth\/lumut-balai-unit-2-geothermal-plant\/","title":{"rendered":"Lumut Balai Unit 2 Geothermal Plant"},"content":{"rendered":"
SYSTEM<\/p><\/div><\/div>
Environmental
\nProtection
\nGeosynthetic, Nets &
\nAnchors and Nails<\/p>\n
TerraGreen, Armamat
\nEco and Soil Nailing<\/p>\n<\/div><\/div><\/div>
OWNER<\/p><\/div><\/div>
PT. Pertamina
\nGeothermal Energy<\/p>\n<\/div><\/div><\/div>
CONTRACTOR<\/p><\/div><\/div>
PT. Wijaya Karya
\n(Persero) Tbk.<\/p>\n<\/div><\/div><\/div>
CONSTRUCTION YEAR<\/p><\/div><\/div>
03\/2024 to
\n06\/2024<\/p>\n<\/div><\/div><\/div>
DESIGNER + CONSULTANT<\/p><\/div><\/div>
First application of Erosion Control Blanket and Protective Net for hauling road development of Lumut Balai Unit 2 Geothermal Plant.<\/p>\n
After massive cut and fill works in hauling road development, cut and fill slope shall be protected from surface erosion issue.<\/p>\n
In addition, some high slopes shall be stabilised with soil nailing.<\/p>\n
Aplikasi pertama dari Selimut Pengendali Erosi dan Jaring proteksi untuk pengembangan jalan angkut Pembangkit Listrik Tenaga Panas Bumi Lumut Balai Unit 2.<\/p>\n
Setelah pekerjaan galian dan timbunan besar- besaran dalam pengembangan jalan angkut, lereng galian dan timbunan harus dilindungi dari masalah erosi permukaan.<\/p>\n
Selain itu, beberapa lereng yang tinggi harus distabilkan dengan soil nailing.<\/p>\n<\/div><\/div><\/div>
Erosion Control Blanket has to be installed on slope with the height up to 50m.<\/span><\/p>\n Selimut Pengendali Erosi harus dipasang di lereng dengan ketinggian hingga 50m.<\/span><\/p>\n<\/div><\/div><\/div> ReCo and FTT work together to provide combination solution soil nail and ArmaMat Eco (combination of TerraGreen and Rectangular Net) to stabilise the slopes and yet provide green facing.<\/p>\n In this project, we are awarded for 2,525 m2 of ArmaMat Eco, 20,890 m2 of TerraGreen and 23,415 m2 of Hydroseeding works.<\/p>\n ReCo dan FTT bekerja sama dalam menyediakan solusi soil nailing dan ArmaMat Eco (kombinasi TerraGreen dan Rectangular Net) untuk menstabilkan lereng dan sekaligus memberikan permukaan hijau.<\/p>\n Dalam proyek ini, kami berhasil memperoleh pekerjaan ArmaMat Eco seluas 2.525 m2, TerraGreen seluas 20.890 m2, dan Hydroseeding seluas 23.415 m2.<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":" Lumut Balai Unit 2 Geothermal Plant Location : Muara Enim, South Sumatera, Indonesia<\/p>\n","protected":false},"author":5977,"featured_media":11485,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"portfolio_category":[356,357],"portfolio_skills":[],"portfolio_tags":[],"class_list":["post-11477","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-case-study","portfolio_category-retaining-walls-case-study"],"yoast_head":"\nSolution<\/h2><\/div>